ViewSchedule.CreateMaterialTakeoff
Method
Description:
Creates a material takeoff.
Creates a material takeoff.
Remarks:
A material takeoff is a schedule that displays information about the materials that make up elements in the model. Unlike regular schedules where each row (before grouping) represents a single element, each row in a material takeoff represents a single <element, material> pair.
A material takeoff is a schedule that displays information about the materials that make up elements in the model. Unlike regular schedules where each row (before grouping) represents a single element, each row in a material takeoff represents a single <element, material> pair.
Parameters
Parameter | Type | Description |
---|---|---|
document | Document | The document to which the new schedule will be added. |
categoryId | ElementId | The ID of the category whose elements will be included in the schedule, or InvalidElementId for a multi-category schedule. |
Return Value
Type | Description |
---|---|
ViewSchedule | The newly created schedule. |
Exceptions
Exception | Condition |
---|---|
ArgumentException | document is not a project document. -or- categoryId is not a valid category for a material takeoff. |
ArgumentNullException | A non-optional argument was null |
ModificationForbiddenException | The document is in failure mode: an operation has failed, and Revit requires the user to either cancel the operation or fix the problem (usually by deleting certain elements). -or- The document is being loaded, or is in the midst of another sensitive process. |
ModificationOutsideTransactionException | The document has no open transaction. |